-
DI series ultra-high definition deformation detector
More +It is used to detect pipeline passing ability before pipeline deformation detection or pipeline magnetic flux leakage internal detection, so as to prevent blockage and detection safety accidents of magnetic flux leakage internal detector.
-
Ultra-high definition magnetic flux leakage internal detector
More +Function:Ultra high definition detection capability exceeding 10m/s, accurate quantification of pipeline defect characteristics.
Configuration:Power section, detection section, mileage section, battery, low-frequency transmitter, receiver, inertial navigation system (optional), and internal stress detection (optional).
-
A-230 All Position Automatic Welding Machine
More +Function: It can be used for all position welding of water pipe and large cylinder. GMAW/FCAW-GS/ GTAW welding processes can be applied. It is suitable for automatic welding of various bevel design, there are three types of bands/tracks to be selected.
Configuration:Welding head, adapter, external wire feeder, welding torch, portable panel, control cables, welding power source.
- [OUR CASES]Xionggu pipeline automatic welding machine has played an important role in this pipeline project2023-09-27- 15:26
- Xionggu Pipeline Automatic Welding Machine is an advanced welding equipment that can achieve efficient and precise welding.
- Read(150008)
- [OUR CASES]Xionggu pipeline automatic welding machine makes welding easier and more reliable2023-08-31- 15:36
- Our process makes welding more precise and ensures high quality welding.
- Read(150000)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Information, this section has completed the main welding task!2023-08-18- 18:57
- As of June 8, this section has welded a total of 9746 welds, with a first-pass welding qualification rate of 98.12%.
- Read(150003)
- [OUR CASES]Xionggu pipeline automatic welding machine helps the construction of Tuoba Hydropower Station!2023-07-28- 18:13
- The high-strength steel water pipes of Yunnan Weixi Tuoba Hydropower Station have a diameter of 10400mm and a thickness of 38mm. The carbon arc gouging groove is adopted, and the xionggu A-230 water pipe automatic welding machine is used for welding.
- Read(150005)
- [OUR CASES]Xionggu Pipeline Automatic Welding Equipment: New Terrain, New Challenge2023-07-26- 15:54
- During the welding process, Xionggu technical service team promptly discovered the differences between the welding in mountain area and the plain area, and coordinated with the project department and the welding complex to correct the shielding gas ratio and parameters as soon as possible. After two rounds of debugging, all welded joints were qualified, and the welding complex started working smoothly.
- Read(150002)
- [OUR CASES]The pipeline has been fully connected. Let's go find the presence of the Xionggu pipeline automatic welding machine.2023-07-26- 15:34
- On July 1, 2023, the ground skeleton project for the Bozi-DaBei Block has been fully completed, connecting the pipeline from G02 valve room to N06 valve room. The first-pass qualification rate for the line welding reached 97.8%.
- Read(150011)
- [NEWS]Good news! Comrade Liu Liangsong from Xionggu Company was awarded the title of "Chengdu Craftsman" in 20232023-06-27- 14:10
- Comrade Liu Liangsong from Xionggu Company was awarded the title of "Chengdu Craftsman" in 2023
- Read(150002)
- [NEWS]Good news! Xionggu Electrical was awarded the Chengdu Academician (Expert) Innovation Workstation Award in 20222023-05-19- 14:05
- After independent application by Xionggu Company, recommendation by the Association of Science and Technology, and expert evaluation, it is planned to designate 20 units including Chengdu Xionggu Jiashi Electrical Appliance Co., Ltd. as Chengdu Academician (Expert) Innovation Workstation.
- Read(3102)
- [NEWS]The quality of Xionggu pipeline automatic welding machine is trustworthy2023-05-16- 13:52
- Xionggu Pipeline Automatic Welding Machine A-300X in the 1st lot of the 3rd West to East Gas Pipeline Project
- Read(3103)
- [OUR CASES]Xionggu Pipeline Automatic Welding Equipment Assists the Crossing Project of the South to North Water Diversion Project in Mengxi County2023-04-10- 16:29
- It is reported from the Xionggu Technical Service Department that the installation and welding task of the Langfang Off-load Branch Pipeline of the Mengxi Project, assisted by the Xionggu automatic welding equipment, was successfully comple...
- Read(3139)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Assists the 2nd lot of directional drilling in the middle section of the 3rd West-East gas pipeline2023-04-10- 14:54
- The welding of the 2nd lot of directional drilling for the Zhongwei-Zaoyang section of the 3rd West to East gas pipeline (Zhongwei-Ji'an) began on February 3, 2023. The EPC contractor is Sichuan Oil Engineering & Construction Co., Ltd.
- Read(3135)
- [NEWS]Xionggu Pipeline Automatic Welding Machine Newsletter: The construction of the first lot of the 3rd West East Gas Pipeline has resumed2023-02-22- 15:54
- On January 30, the Xionggu pipeline automatic welding machine service team learned from the project office of the middle section (Zhongwei Ji'an) project (Zhongwei Zaoyang section) of the 3rd West to East gas pipeline that the engineering equipment and construction personnel at the construction site of the first lot of the project have arrived and are now fully resuming work and working hard to catch up with the schedule.
- Read(3135)
- [NEWS]Xionggu Pipeline Automatic Welding Machine In CCTV News2023-02-09- 11:20
- CCTV News is broadcasting a piece of news about the 4th West to East Gas Pipeline Project, and the eye-catching picture of Xionggu pipeline automatic welding machine appears.
- Read(3134)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Participates In The Middle Section of The 3rd West To East Gas Pipeline2023-01-31- 15:53
- The middle section of the 3rd West to East gas pipeline has a total length of 2090 km. It starts from Zhongwei, Ningxia Province, passes through 7 provinces in China, and ends at Ji'an City, Jiangxi Province.
- Read(3136)
- [OUR CASES]The new trend of Xionggu pipeline automatic welding machine- the 4th West to East gas pipeline completed 5 days ahead of schedule2023-01-31- 15:13
- Till December 26th, 2022, the 4th West-East gas pipeline Project Department of Lioahe Oil Engineering & Construction Co., Ltd. has completed the production goal of welding 200km pipeline by the end of the year, five days ahead of schedule, with the result of completing 200.44km of pipeline welding.
- Read(3157)
- [OUR CASES]What welding problems can be solved by flexible internal welding machine for pipeline in mountainous areas?2022-12-24- 14:12
- The advantages of automatic pipeline welding lie in that the welding process parameters are easy to control, the welding process is stable, the weld mechanical properties are excellent, and the welding parameters can be collected and transmitted in real time.
- Read(3136)
- [OUR CASES]Xionggu Automatic Welding Machine Participates in the Construction of Zhongwei Second Station Project in the 3rd West to East Gas Pipeline2022-12-20- 14:16
- Three pipes in the same ditch! Xionggu Automatic Welding Machine Participates in the Construction of Zhongwei Second Station Project in the 3rd West to East Gas Pipeline.
- Read(3135)