A-610 Dual Torch Automatic All Position Pipeline Welding Machine
More +Function:It is suitable for root pass, hot pass, filling and capping of pipeline welding joint by GMAW-S/GMAW-P/FCAW-GS welding processes in the field.
Configuration:Welding head, wire feeder, central controller, portable panel, welding power source, water cooler, water cooled torch, control cables.
-
A-800 Automatic Internal Pipeline Welding Machine
More +Function:It is suitable for high efficiency automatic GMAW welding of pipeline internal circular seam.
Configuration:Machine host, central controller, reach rod assembly, welding power source adapter and dedicated welding power source.
-
MD-1100CC/CV Diesel Engine Driven Pipeline Welding Workstation
More +Function: FCAW-SS, SMAW (cellulose stick), SMAW (low hydrogen stick), GTAW
-
Self-shielded Cored Wire Torch
More +Usage: Self-shielded flux-cored wire welding torch for long distance pipeline welding.
Features: Large cross-section of cable, suitable for large current and long time welding; welding torch switch and attenuation switch are designed with waterproof and dust-proof, long service life and high reliability.
-
A-305 Single Torch Automatic External Pipeline Welding System
More +Function: It is suitable for root pass, hot pass, filling and capping of pipe joint welding with GMAW, FCAW-GS and GTAW welding processes in the field. It is capable of conducting all position welding of various workpieces when installed on various bands.
Configuration:Welding head, adapter, portable panel, control cables, band (optional), welding power source (to be selected according to specific welding process)
- [NEWS]the second quarter conference of Xionggu Company was held2024-07-31- 20:02
- have the courage to challenge the international market, expand the influence of our products, push our equipment to the international stage, and make Xionggu a true provider of global pipeline welding equipment.
- Read(350019)
- [OUR CASES]Xionggu Pipeline Automatic Welding Equipment Assists the Crossing Project of the South to North Water Diversion Project in Mengxi County2023-04-10- 16:29
- It is reported from the Xionggu Technical Service Department that the installation and welding task of the Langfang Off-load Branch Pipeline of the Mengxi Project, assisted by the Xionggu automatic welding equipment, was successfully comple...
- Read(3159)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Assists the 2nd lot of directional drilling in the middle section of the 3rd West-East gas pipeline2023-04-10- 14:54
- The welding of the 2nd lot of directional drilling for the Zhongwei-Zaoyang section of the 3rd West to East gas pipeline (Zhongwei-Ji'an) began on February 3, 2023. The EPC contractor is Sichuan Oil Engineering & Construction Co., Ltd.
- Read(3142)
- [NEWS]Xionggu Pipeline Automatic Welding Machine Newsletter: The construction of the first lot of the 3rd West East Gas Pipeline has resumed2023-02-22- 15:54
- On January 30, the Xionggu pipeline automatic welding machine service team learned from the project office of the middle section (Zhongwei Ji'an) project (Zhongwei Zaoyang section) of the 3rd West to East gas pipeline that the engineering equipment and construction personnel at the construction site of the first lot of the project have arrived and are now fully resuming work and working hard to catch up with the schedule.
- Read(3143)
- [NEWS]Xionggu Pipeline Automatic Welding Machine In CCTV News2023-02-09- 11:20
- CCTV News is broadcasting a piece of news about the 4th West to East Gas Pipeline Project, and the eye-catching picture of Xionggu pipeline automatic welding machine appears.
- Read(3147)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Participates In The Middle Section of The 3rd West To East Gas Pipeline2023-01-31- 15:53
- The middle section of the 3rd West to East gas pipeline has a total length of 2090 km. It starts from Zhongwei, Ningxia Province, passes through 7 provinces in China, and ends at Ji'an City, Jiangxi Province.
- Read(3145)
- [OUR CASES]The new trend of Xionggu pipeline automatic welding machine- the 4th West to East gas pipeline completed 5 days ahead of schedule2023-01-31- 15:13
- Till December 26th, 2022, the 4th West-East gas pipeline Project Department of Lioahe Oil Engineering & Construction Co., Ltd. has completed the production goal of welding 200km pipeline by the end of the year, five days ahead of schedule, with the result of completing 200.44km of pipeline welding.
- Read(3164)
- [OUR CASES]What welding problems can be solved by flexible internal welding machine for pipeline in mountainous areas?2022-12-24- 14:12
- The advantages of automatic pipeline welding lie in that the welding process parameters are easy to control, the welding process is stable, the weld mechanical properties are excellent, and the welding parameters can be collected and transmitted in real time.
- Read(3141)
- [OUR CASES]Xionggu Automatic Welding Machine Participates in the Construction of Zhongwei Second Station Project in the 3rd West to East Gas Pipeline2022-12-20- 14:16
- Three pipes in the same ditch! Xionggu Automatic Welding Machine Participates in the Construction of Zhongwei Second Station Project in the 3rd West to East Gas Pipeline.
- Read(3147)
- [OUR CASES]Another pipeline project welded by Xionggu pipeline automatic welding machine has been completed2022-12-06- 16:19
- The east trunk line of Shandong pipe network constructed by Xionggu pipeline automatic welding machine has been completed.
- Read(3140)
- [OUR CASES]Xionggu Pipeline Automatic Welding Machine Sets A Record in the 4th West to East Gas Pipeline2022-11-26- 11:12
- The spread JH04 of Jianghan Oil Engineering & Construction Company breaks the record in the 3rd lot of the 4th West to East gas pipeline project. 40 joints (1219mm) are completed in one shift, with a one-time 100% qualified rate.
- Read(3131)
- [OUR CASES]Xionggu pipeline automatic welding machine sends good news, and welding of this lot of the project starts2022-07-29- 16:40
- According to the technical service team of automatic welding machine of Xionggu company, the construction of the 4th lot of the 3rd West to East gas pipeline has started.
- Read(3108)
- [OUR CASES]Xionggu pipeline automatic welding machine assists Jiaozhou Bay offshore natural gas pipeline project2022-06-13- 11:14
- The main is scheduled to put into operation in October this year! Xionggu pipeline automatic welding machine assists Jiaozhou Bay offshore natural gas pipeline project
- Read(3118)
- [OUR CASES]Xionggu pipeline automatic welding machine participates in the “Emergency Mission · 2022” exercise of earthquake relief in Plateau regions2022-06-11- 15:53
- The “Emergency mission · 2022” exercise of earthquake relief and disaster relief in Plateau regions kicked off on May 11th, 2022.
- Read(3119)
- [OUR CASES]The middle section of the 3rd West to East gas pipeline participated by the Xionggu pipeline automatic welding machine has been completed!2022-06-06- 15:24
- The mainline welding of the first lot of the middle section of 3rd West to East (Zaoyang-Xiantao section) has been completed by Xinjiang Oil Engineering & Construction Co., Ltd. since March 28th, 2022.
- Read(3108)