Xionggu Pipeline Automatic Welding Machine Participates In The Middle Section of The 3rd West To East Gas Pipeline
The middle section of the 3rd West to East gas pipeline has a total length of 2090 km. It starts from Zhongwei, Ningxia Province, passes through 7 provinces in China, and ends at Ji'an City, Jiangxi Province. The design pressure of the pipeline is 10 MPa, the design annual gas transmission capacity is 25 billion m3, and the pipe diameter is 1219 mm.
A total of 10 compressor stations and 2 branch lines are set along the whole line. Xionggu internal welding machine and dual torch pipeline automatic welding machines participate in the construction of the project. After the completion of the project the annual gas transmission capacity of the West to East gas pipeline system can be increased by about 25 billion cubic meters. Compared with coal consumption, the annual carbon dioxide emission can be reduced by 70.89 million tons. It is important to promote the adjustment of energy structure and the transformation of development mode, ensure the supply of clean energy along the line, promote energy conservation and emission reduction along the line, and achieve the goal of carbon neutralization in China.
“Recommend”
- The new trend of Xionggu pipeline automatic welding machine- the 4th West to East gas pipeline completed 5 days ahead of schedule
- What welding problems can be solved by flexible internal welding machine for pipeline in mountainous areas?
- Xionggu Automatic Welding Machine Participates in the Construction of Zhongwei Second Station Project in the 3rd West to East Gas Pipeline
- Another pipeline project welded by Xionggu pipeline automatic welding machine has been completed
- Xionggu Pipeline Automatic Welding Machine Sets A Record in the 4th West to East Gas Pipeline
- Xionggu Automatic Welding Machine Accelerates the Welding Work of the 1st Lot of Nantong-Yongzhi Section of Sino-Russia Eastern Pipeline Phase 3
- Pipeline automatic welding machine news, Welding of the 6th lot of the 3rd West to East has begun
- Xionggu automatic welding machine accelerates the welding work of the 1st lot of Sino-Russia Eastern Pipeline
- Xionggu pipeline automatic welding machine assists Jiaozhou Bay offshore natural gas pipeline project
- Xionggu pipeline automatic welding machine participates in the “Emergency Mission · 2022” exercise of earthquake relief in Plateau regions
【editor】:xiongguCopyright:https://www.xg1992.comReproduced please indicate the source